MOQ 100 pcs per colour, per style
What to send a clothing factory to get an accurate first sample
A clear brief saves a fit round. Use this checklist before you message any manufacturer — including us.

1. Flat sketches
Front, back and side flats with seams, stitching and any details called out. Photos of a reference garment help.
2. Measurements
A size chart for your base size with how each point of measure is taken, plus the grade you want between sizes.
3. Fabric
Fibre content, weight, stretch and hand-feel — ideally a physical swatch. Tell us the target look and care requirements.
4. Trims and labels
Zips, buttons, drawcords, elastics, main label, care label and packaging.
5. Quantity and colours
Total quantity and quantity per colour. Our minimum is 100 pieces per colour, per style.
6. Timeline expectations
Pattern development takes 7–15 calendar days once specifications and materials are confirmed, excluding shipping; fit revisions can add time.
FAQ
Do I need a full tech pack?
Not always. A sketch or a reference garment with measurements is enough to start; we will tell you what else we need.